Milestone: PIA Governed Evidence-to-Mapping Handoff
Milestone: PIA Governed Evidence-to-Mapping Handoff
Date: 2026-07-29
Status: Implemented and validated working checkpoint
Authority: Working/proposed; controlled-participant use remains gated
Commit: To be assigned at the next intentional commit boundary
Builds on: PIA Protected Evidence Review and Session Lifecycle
Overview
This checkpoint connects accepted, source-grounded participant evidence to bounded capability-mapping proposals. It preserves the separation between evidence extraction, evidence review, capability interpretation, graph projection, and participant reporting.
The mapping workflow is a protected local handoff. It does not write a participant record to a graph, generate a report claim, create a participant score, or promote the working capability vocabulary.
What became operationally testable
Bounded mapping proposals
- proposals originate only from evidence already reviewed and included for downstream use;
- proposals use the working PIA capability vocabulary without storing participant data in that vocabulary;
- each proposal preserves source identity and locator, inference level, confidence, confidence basis, behavioral basis, scope limit, source-independence note, and negative boundary;
- contextual and educational interpretations remain explicitly bounded; and
- protected mapping records remain encrypted at rest inside the local participant store.
Accountable mapping review
- a proposer cannot accept, reject, or narrow their own mapping proposal;
- an authorized distinct account can accept or reject a proposal with a recorded reason;
- narrowing preserves the original proposal as superseded and creates a separately identified, accepted successor with narrower boundaries;
- unresolved proposals are presented in a reviewer queue for direct selection; and
- all mapping decisions append protected audit events rather than overwriting earlier interpretation history.
Local administration usability
- local reviewer provisioning supports masked windowed passphrase entry when terminal hidden-input handling is unreliable; and
- the owner and reviewer account roles can be exercised by one operator for controlled technical testing without representing that test as independent human review.
Controlled test evidence
The local protected-store test used only synthetic evidence and local account roles. The following paths were exercised successfully:
| Test path | Verified result |
|---|---|
| Owner-created proposal + reviewer acceptance | Accepted interpretation retained with its stated confidence and boundary |
| Owner-created proposal + reviewer rejection | Proposal retained in audit history and excluded from downstream use |
| Owner-created proposal + reviewer scope narrowing | Original marked superseded; narrowed successor accepted with explicit replacement boundary |
| Store validation after decisions | Encryption, checksums, audit-chain integrity, authorization state, and retention controls passed |
The final validation displayed 7 synthetic sessions, 4 synthetic artifacts, and 162 protected audit events. Those counts are test-state observations, not repository data and must not be treated as participant metrics.
Operating model
For the present single-operator controlled test environment:
- the local owner account creates or proposes work;
- the separate local reviewer account performs the mapping decision; and
- the test record identifies this as one operator exercising two protected roles.
This demonstrates technical role separation and auditability. It does not substitute for independent human review in a consequential participant or production workflow. Such use remains subject to the controlled-pilot, privacy, consent, recovery, security, and operational review gates.
Validation evidence
- 19 focused protected-intake tests passed after the reviewer-provisioning and review-queue additions;
- the protected-store validation passed after the acceptance, rejection, and narrowing paths; and
- repository changes remain participant-data-free by design.
These results establish implementation coherence, not security certification, privacy approval, production authorization, or independent-review completion.
What remains outside this boundary
- production or unsupervised real-participant intake;
- a formally approved independent-review and exception process;
- graph projection of protected participant mappings;
- automated participant-report generation from the protected mapping state;
- image or scanned-document OCR;
- multi-user or network-exposed deployment; and
- promotion of any working ontology, capability, mapping, or intake artifact.
Next governed checkpoint
The next checkpoint should define the accountable handoff from accepted, bounded mapping state to a dry-run projection manifest and participant-facing outputs. It must preserve every source, review, scope, confidence, uncertainty, and negative-boundary control established here.